GB200-Class Infrastructure Readiness
Caprelion does not sell GB200 systems. Caprelion prepares the complete dedicated physical infrastructure layer for customers deploying GB200-class rack-scale AI servers.
You bring the GB200 NVL72 cluster. Caprelion prepares the dedicated AI POD infrastructure.
AI Rack Power
~130 kW
Planning envelope
GPU Count
72
Blackwell GPUs per NVL72
CPU Count
36
Grace CPUs per NVL72
Cooling
Liquid
Direct-to-chip primary
Infrastructure Specification
GB200 NVL72 — AI POD Infrastructure Planning
System Generation
Blackwell
System Class
GB200 NVL72
Deployment Category
NVL72-class rack-scale AI system
Caprelion Infrastructure Model
Complete SU-class AI POD block
AI Rack Power Envelope
Approx. 130 kW-class (planning assumption)
Primary Cooling
Direct-to-chip liquid cooling
Secondary Cooling
Air cooling support for residual thermal load
Network
High-bandwidth InfiniBand / Ethernet cluster networking
Optical
Optical fiber infrastructure within and between AI POD zones
Power Architecture
Standard AC power distribution with UPS, busway, RPP, PDU
Deployment Model
Complete dedicated AI POD environment — not rack-by-rack colocation
Caprelion Role
Power, liquid cooling, network readiness, site conversion, OEM/EPC coordination, commissioning, operations readiness
Planning envelope only. Subject to site conditions, OEM/EPC validation and final engineering design.
Infrastructure Implications
What GB200 NVL72 Demands
Rack-Scale Form Factor
A single GB200 NVL72 system occupies a full rack-scale form factor combining 36 Grace CPUs and 72 Blackwell GPUs in a single NVLink domain. Infrastructure must be planned at the AI POD / SU level.
~130 kW Per AI Rack
At approximately 130 kW per AI rack, GB200 NVL72 deployments demand robust power distribution. Busway, RPP and PDU infrastructure must be coordinated with the liquid cooling plant from design stage.
Direct-to-Chip Liquid Cooling
GB200 NVL72 requires direct-to-chip liquid cooling as the primary thermal management approach. CDU, XDU, manifold and external heat rejection infrastructure must be planned as part of the AI POD delivery.
High-Bandwidth Cluster Networking
InfiniBand and/or Ethernet cluster networking, plus optical fiber infrastructure, must be planned as part of the AI POD delivery for GB200 NVL72-class clusters.
Commissioning and Operations
AI POD commissioning and handover covers power, cooling, network and monitoring systems. Operations readiness documentation and support are part of the AI POD delivery.
Upgrade Path to GB300
Caprelion AI POD infrastructure for GB200 is planned with upgrade headroom toward GB300 NVL72 (~150 kW). A clear modernization path is part of the design logic.
Complete SU / AI POD Delivery Model
Caprelion does not provide rack-by-rack colocation for GB200 NVL72 deployments. Each GB200 NVL72 cluster is deployed in a complete, dedicated AI POD / SU-class infrastructure block covering power readiness, liquid cooling readiness, network readiness, site conversion, OEM/EPC coordination, commissioning and operations support.
Infrastructure Evolution
GB200 → GB300 Infrastructure Evolution
GB200 NVL72 — Blackwell
~130 kW
Per AI rack planning envelope. Liquid cooling readiness required. Standard AC power architecture.
GB300 NVL72 — Blackwell Ultra (Current Priority)
~150 kW
Per AI rack planning envelope. Liquid cooling dominant. Higher power uplift vs GB200. Enhanced CDU/XDU.
Compliance Framework
Compliance-Ready AI POD Delivery
Caprelion AI POD infrastructure is delivered under a compliance-ready framework, designed for alignment with leading data center, security, quality and sustainability standards.
Data Center Infrastructure
Design and operations standard
Information Security
Management system readiness
Quality Management
System readiness
Sustainability Principles
Environmental assessment
Commissioning Framework
Handover and testing
Operations Readiness
Ongoing management
Designed for compliance alignment and project-specific certification readiness. Final certification depends on project scope, audit, commissioning, local authority requirements and assessor review. Caprelion does not claim formal certification unless separately confirmed.